Blog

Here we host info on our other products, additional photos, and progress on our jobs. We are continually updating our site, and have yet to include all of our products. Please check up on this page, email, call,  or visit our showroom to see our products! 

preparation is crucial

Whenever we do a job, we do all that we can to ensure the unit goes in the first time. It requires a lot of preparation and the proper set up to make that happen. I was fortunate to receive this job from Bay Marin Construction that required me to use my creative skills and knowledge to make sure a relatively simple Regency 90 degree unit with saloon doors fit in very unique tile. 

 

The first image shows the tile is actually two parts: The main piece and a rectangular one in the center. The contractor and I had managed to come up with pushing the center one flush with the raised portion of the tile to make sure the glass had no gaps against the wall.  

After all was said and done, there was a rush to get this unit in. Luckily Alicia, our head of scheduling and miracle worker, made sure to get this unit in as soon as possible. The home owner had a large house warming party and our shower had to be in. Thanks to the proper preparation, attention to detail, and the extra mile, Junior & Sergio installed this unit without flaw.

In the end, it came out beautiful. Utilizing 3/8" and 1/2" Starphire glass, the unit ties everything together and shows off the unique tile. 

As always, please feel free to look at our work, our other products, or contact us!